Before using the atmosphere rotary furnace, it is necessary to install and try out the equipment. This type of equipment has a series of preparatory work before starting up, and only when the preparatory work is done can it ensure the normal operation of the later work. Now, let's take a look at the preparatory work before starting up.
1. Check and confirm the gas butterfly valve, the damper is closed, and the scale indicates zero position.
2. Check and confirm the gas butterfly valve.
Check if the connecting rod is worn, if the screws are loose, and lubricate the connecting rod 3. Use soapy water to check the gas pipeline and valves for gas leakage. The pipeline emptying valve is closed. Confirm that the gas alarm controller has no alarms 4. Check that the fan triangular belt is undamaged and moderately tightened. Check that the bearing box and rotary motor reducer are not lacking in oil 5. Open the inlet and outlet valves of the fan cooling water and check that the cooling water pressure is normal Many people do not prepare well when starting up, and it is easy to encounter some problems during operation, which can affect the later use effect