lithium batteryspecializedScientific researchAffiliated to China Construction Materials Group
Telephone:13720777965
Contact
13720777965

Contacts:Manager Chen

Mail:source@sinokiln.com

TEL:029-33579267

Address:210 Yuquan West Road, Qindu District, Xianyang City, Shaanxi Province

Operating procedures for laboratory rotary furnaces

time:2022/1/20 12:20:00 来源:http://cn.sinokiln.com/news968456.html

3: Start the machine, set the initial temperature of the temperature controller to 80 degrees Celsius, connect the power to the burner, open the main valve and combustion valve of the gas outdoor pipeline, rotate the remote ignition switch to the ignition position for ignition, and observe in a timely manner that the interval between ignition times should not be less than 5 minutes. Determine whether the ignition is successful, and strictly prohibit the second ignition if the interval is too short or the reason for the first ignition failure is not found.

相关标签:Laboratory rotary furnace, rotary furnace, rotary furnace equipment,


Related products/ RELATED PRODUCTS

Related products/ RELATED PRODUCTS